On September 7, 2014 – Sale Opening ceremony of Son Ky 1 Apartments

On September 7, 2014 Tan Binh Production - Export Import – Service and Investment Joint Stock Company (Tanimex) organized the sale opening ceremony of  Tanibuilding Son Ky 1 apartments. Project was built on a plot 8915.5 m² of land, nearly 60,000 m² floor area with 03 contiguous frontage CN13-DC8-DC13 and 1.7 hectares park preparing in operation in Son Ky Ward - Tan Phu District.

Project Perspective

Son Ky Tanibuilding was built adjacent Celadon ecology urban area, Aeon Mall (Japan), near the hospital system, schools, amusement parks ...

Signing  the contract  providing credit for the project

The project consists of 6 blocks A-B-C-D-E-F Apartments with 507 units designed by SAGEN Constructive Design Consultancy Joint Stock Company (SAGEN), with a construction density of only 44.3%, open to receive maximum natural light and fresh air.

Welcome guests

With the success of this sale opening round (already sold 376/507 units), Tanimex and SAGEN confident to continue promote the development of real estate projects.

Real estate market has frozen in the past years and SAGEN turned to the industry field as well as buildings of electric power, hotel, trade center ... (with high liquidity). At present, real estate market has signs of recovery, this is a great opportunity for SAGEN to accelerate follow on development strategy orientation of company in next 3-5 years