October 5th, 2015 – Signing design contract for project “Cream and yoghurt manufacturing factory”

On 5th October 2015, Sagen has signed the design contract for project “Cream and yoghurt manufacturing factory”. This is the second contract for designing “cream and yoghurt manufacturing factory” signed between Sagen and Kido (the first factory is built at Cu Chi District, Ho Chi Minh City).

Perspective of the factory

The factory will be built in an area of 25.000 m2 at VSIP - Bac Ninh, in which the first construction phase is 13.000 m2.